Chapter 3 Procedures Before Operations - Mitsubishi Electric MELSEC iQ-F Series FX5 User Manual

Positioning control - intelligent function module
Hide thumbs Also See for MELSEC iQ-F Series FX5:
Table of Contents

Advertisement

3
PROCEDURES BEFORE OPERATIONS
This chapter describes the procedures before operation.
1.
Module mounting
Mount the positioning module to the CPU module. For details, refer to the following.
MELSEC iQ-F FX5U User's Manual (Hardware)
MELSEC iQ-F FX5UC User's Manual (Hardware)
2.
Wiring
Wire the positioning module to the external device.
3.
Adding modules
Add positioning modules to the unit configuration diagram for the project using GX Works3.
4.
Module settings
Set the positioning module using GX Works3.
For details, refer to Page 312 Module Parameters.
5.
Auto refresh settings
Set the refresh using GX Works3.
For details, refer to Page 318 Refresh settings.
6.
Checking connections
Check the the positioning module and the external device connections.
7.
Programming
Create the program.
For details, refer to Page 479 PROGRAMMING.
8.
Test run
Check that the positioning operations operate as they have been designed.
3 PROCEDURES BEFORE OPERATIONS
22

Advertisement

Table of Contents
loading

Table of Contents