Commissioning

5.5 First commissioning with the AOP30

5.5
First commissioning with the AOP30
5.5.1

Initial ramp-up

Start screen
When the system is switched on for the first time, the Control Unit is initialized automatically.
The following screen is displayed:
Figure 5-36
When the system boots up, the parameter descriptions are loaded into the operating field
from the CompactFlash card.
Figure 5-37
240
Initial screen
0%
50%
Load the parameter descriptions while booting up the system
100%