Specify access point:
● Select S7ONLINE access for a device, if the connection to the programming device or PC
● Select DEVICE access for a device if the connection to the programming device or PC is
Transferring the STARTER project to the drive unit
To transfer the STARTER project you created offline to the drive unit, carry out the following
steps:
Step
NOTICE
The project has now been loaded to the drive unit. The data is currently only stored in the
volatile memory of the drive unit and not on the CompactFlash card.
To store the project data on the CompactFlash card so that it is protected in the event of a
power failure, carry out the following step.
Step
Note
The Copy from RAM to ROM icon is only active when the drive unit is selected in the project
navigator.
Converter cabinet units
Operating Instructions, 03/2012, A5E03263466A
is established via PROFINET or PROFIBUS.
established via the Ethernet interface.
1
Choose
Project > Connect to selected target system
2
Choose the menu item
Target system > Load > Load project to target system
3
Choose
Target system > Copy from RAM to ROM
5.3 Procedure for commissioning via STARTER
Commissioning
Selection in toolbar
Selection in toolbar