Figure 5-37 Automatic door status sensor
Step 3 Install a new automatic door status sensor and connect the cable to the new
sensor.
Step 4 Check that the automatic door status sensor works properly.
----End

5.4.4 Replacing a Smart ETH Gateway

Impact on the System
The ECC800 system cannot monitor the devices connected to the faulty smart ETH
gateway.
Preparations
Procedure
Step 1 Label each cable based on the corresponding ports on the smart ETH gateway.
Step 2 Disconnect cables from the smart ETH gateway.
Step 3 Remove the faulty smart ETH gateway from the guide rails.
Figure 5-38 Removing a smart ETH gateway
Step 4 Install the spare smart ETH gateway in the original position and reconnect the
cables.
Issue 02 (2022-07-30)
Tools: ESD wrist strap, ESD gloves, Phillips screwdriver, step ladder, label,
marker
Material: spare ETH gateway