Figure 5-59 Removing the PAD power connector holder (BOM number: 14190242)
Step 7 Assemble the PAD power connector holder.
1.
2.
Figure 5-60 Assembling the PAD power connector holder (BOM number:
14190892)
Figure 5-61 Assembling the PAD power connector holder (BOM number:
14190242)
Step 8 Connect cables from the power connector to the FusionModule Actuator, and
route the cables.
Issue 02 (2022-07-30)
Clamp the power connector to the guide rail of the holder.
Install the holder cover using three M4x12 screw assemblies.