Step 1 Label each cable based on the corresponding ports on the eLight actuator.
Step 2 Remove cables from the eLight actuator.
Step 3 Remove the old eLight actuator from guide rails.
Step 4 Install the new eLight actuator in the original position and connect the cables.
Step 5 Check the parameters and communication status of the eLight actuator to ensure
normal communication.
Step 6 On the ECC800-Pro WebUI, choose Maintenance > Deployment Wizard >
Linkage Test > eLight Actuator Commissioning and click Test. The eLight strip
Issue 02 (2022-07-30)
Figure 5-70 Positions of the eLight actuator and power supply
(1) eLight actuator
(3) Upstream fuse
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Parts Replacement
(2) eLight power supply
120

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r022c10

Table of Contents