FusionModule2000 Smart Modular Data Center
Maintenance Guide
Figure 5-62 Connecting power connector cables (BOM number: 14190892)
Figure 5-63 Connecting power connector cables (BOM number: 14190242)
Step 9 Secure the PAD power connector holder.
1.
2.
Issue 02 (2022-07-30)
Remove the baffle plate from the power connector mounting holes in the
door box.
Secure the PAD power connector holder to the door box using two M4x12
screw assemblies.
Copyright © Huawei Digital Power Technologies Co., Ltd.