Quarterly Maintenance - Huawei FusionModule2000 Maintenance Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Maintenance Guide

3.4 Quarterly Maintenance

Table 3-5 Quarterly maintenance for the power supply and distribution system
Item
Operating
temperature
and humidity of
the PDF
Connection
between the
SmartLi and the
battery modules
Issue 02 (2022-07-30)
Method
On the
ECC800-Pro
WebUI, choose
Monitoring >
Power
Distribution.
Visual
inspection
Copyright © Huawei Digital Power Technologies Co., Ltd.
Expected Result
● Operating
temperature: –
10°C to +50°C
● Humidity: 5%–
95% RH
The battery modules
are clean, and the
copper bars for
connecting the
battery modules are
secured.
3 Routine Maintenance
Troubleshooting
Check whether the
smart cooling
products and
dehumidifiers in the
equipment room are
normal.
Use cotton cloth to
clean the battery
modules. Exercise
caution when
cleaning the battery
modules because the
voltage of the
battery modules is
high.
Check the bolt at
every terminal. If
any bolt is loose,
tighten it.
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r022c10

Table of Contents