Procedure
Step 1 Disconnect the upstream fuse for the eLight power supply.
Step 2 Label each cable based on the corresponding ports on the eLight power supply.
Step 3 Remove the cables from the eLight power supply.
Step 4 Remove the old eLight power supply from guide rails.
Issue 02 (2022-07-30)
Figure 5-71 Positions of the eLight actuator and power supply (inside the
aisle)
(1) eLight actuator
(3) Upstream fuse
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Parts Replacement
(2) eLight power supply
122