FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
Figure 4-7 Installing the ground cable or ground lug
(1) Ground cable
----End
Follow-up Procedure
After the unit is hoisted and installed, verify the installation to ensure normal use
of products and smooth subsequent installation.
Table 4-5 Post-installation checklist
No.
1
Issue 03 (2021-04-20)
NO TE
● The unit can be grounded using either a ground lug or a ground cable.
● There are two ground points for the unit. Select the nearest one.
Item
Contact between
units and concrete
platforms
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 System Installation (Building Scenario)
(2) Ground lug
Check Method
Observe.
Expected Result
The units are in close
contact with and
evenly supported by
the concrete
platforms.
44