FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
12.15.4.1 Refrigerant Charge Amount Requirements
Table 12-2 Charge amount of refrigerant
Charge Amount of Refrigerant
Standard amount (kg)
12.15.4.2 Vacuumizing
Prerequisites
● Before vacuumizing, check that the refrigerant pipe system has passed the air
tightness test and does not leak.
● Before vacuumizing, ensure that all connectors on the unit are tightened.
● System high pressure may occur if the system is not vacummized or is not
thoroughly vacummized. Therefore, ensure that the system is thoroughly
vacummized.
Procedure
Step 1 Connect the pressure gauge and vacuum pump to vacuumize the device.
Figure 12-35 Vacuumizing
(1) Vacuum pump
(4) Liquid pipe needle valve
Step 2 In the beginning, the vacuum pump makes loud noises and exhausts white smoke
from the exhaust vent. After 10 minutes, if it still exhausts white smoke, observe it
for another 10 minutes because the cooling system may not be sealed properly or
there may be too much residual refrigerant or water in the cooling system.
Issue 03 (2021-04-20)
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
FusionCol8000-E240H4
18.5
(2) Pressure gauge
(5) Sight glass
12 Component Replacement
(3) Low pressure needle valve
183