Huawei FusionModule500 V100R021C10 User Manual page 7

Smart mini data center
Hide thumbs Also See for FusionModule500 V100R021C10:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual
Contents
4.2.6.1 Installing the SIM Card and Antenna......................................................................................................................75
4.2.6.2 Installing a PAD.............................................................................................................................................................. 77
4.2.6.3 Installing Remote T/H Sensors for Smart Cooling Products........................................................................... 80
4.2.6.4 Installing T/H Sensors...................................................................................................................................................81
4.2.6.5 Installing an Electrode Water Sensor...................................................................................................................... 82
4.2.6.6 (Optional) Installing a Server.................................................................................................................................... 82
4.2.6.7 (Optional) Installing a Camera................................................................................................................................. 84
4.2.6.8 (Optional) Installing a LAN Switch..........................................................................................................................88
4.2.6.9 Installing an IVS1800.................................................................................................................................................... 89
4.3 Cable Routing......................................................................................................................................................................... 95
4.3.1 System Cabling Rules....................................................................................................................................................... 95
4.3.2 Cable Connections to the Power Supply and Distribution System...................................................................99
4.3.2.1 Grounding the Smart Module....................................................................................................................................99
4.3.2.2 Connecting Cabinet Input Power Cables............................................................................................................. 100
4.3.2.3 Connecting rPDU Power Cables............................................................................................................................. 101
4.3.2.4 Connecting Cables Between the Lithium Battery and the UPS................................................................... 102
4.3.3 Management System Cable Connection................................................................................................................. 105
4.3.3.1 Connecting IVS Cables............................................................................................................................................... 105
4.4 Verifying the Installation................................................................................................................................................. 106
5 Power-On Commissioning................................................................................................. 109
5.1 Power-On Commissioning for the Power Supply and Distribution System................................................... 109
5.1.1 UPS Power-On Commissioning.................................................................................................................................. 110
5.1.2 Connecting the Lithium Battery Supply.................................................................................................................. 111
5.2 Power-On Commissioning for the Cooling System.................................................................................................111
5.2.1 Powering on Devices...................................................................................................................................................... 112
5.2.2 Performing Initial Configuration................................................................................................................................ 112
5.2.3 Commissioning the Cooling System......................................................................................................................... 114
5.3 Management System Power-On Commissioning....................................................................................................117
5.3.1 Preparations and WebUI Login.................................................................................................................................. 117
5.3.2 Preparations and App Login........................................................................................................................................ 121
5.3.3 Date and Time................................................................................................................................................................. 124
5.3.4 Creating a Micro-module Plan View........................................................................................................................ 124
5.3.5 How Can I Add a UPS2000G?..................................................................................................................................... 124
5.3.6 Commissioning Sensors................................................................................................................................................ 125
5.3.6.2 Commissioning a T/H Sensor.................................................................................................................................. 126
5.3.6.3 Commissioning the Electrode Water Sensor .....................................................................................................128
5.3.7 Commissioning Cabinet Electronic Clasp Locks....................................................................................................130
5.3.8 Commissioning Event Notification............................................................................................................................ 134
5.3.9 Linkage Control................................................................................................................................................................139
Issue 01 (2020-11-30)
Copyright © Huawei Technologies Co., Ltd.
vi

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionmodule500-su61a12s

Table of Contents