5.1 Power-On Commissioning for the Power Supply and
Distribution System
Prerequisites
The installation has been checked.
Configure an upstream protective device that meets the overload and short-circuit
protection requirements for the cabinet. If one power input is overloaded or short-
circuited, the system can switch to the other power input automatically.
Procedure
Step 1 Switch on all SPD circuit breakers.
Step 2 Switch on the power input circuit breaker outside the cabinet to power on the
cabinet.
Step 3 Switch on the UPS input circuit breaker.
Step 4 After the UPS starts, set parameters such as the battery capacity based on the site
requirements, start the inverter, and switch on the UPS output circuit breaker.
Step 5 Switch on the rPDU circuit breakers.
Issue 01 (2020-11-30)
5
NO TICE
NO TE
If the surge protection module indicator is green, the SPD is running properly. If the surge
protection module indicator is red, the surge protection module is faulty and must be
replaced immediately.
Copyright © Huawei Technologies Co., Ltd.

Power-On Commissioning

5 Power-On Commissioning
109

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionmodule500-su61a12s

Table of Contents