5) Lift the other side as well and remove the packaging and plastic materials.
Packing Material
6) Move the equipment in the direction of the arrow [A] and take out the 2 slope stored at the
center of the palette in the direction of the arow [B].
[A]
[B]
7
Installation > Unpacking Procedure
Plastic Material
F-7-10
Slope Plates
F-7-11
7
Installation > Unpacking Procedure
7) Remove the 2 pin attached to the backside of the slope plates with tape.
Pins
8) Turn the slope plates over. Fit the plalettes to the pin hples on the slope plates and insert
yhe 2 pins.
Pins
7-6
F-7-12
F-7-13
7-6