GE TransPort PT900 User Manual page 45

Portable ultrasonic flow meter for liquids
Hide thumbs Also See for TransPort PT900:
Table of Contents

Advertisement

2.5.6c
Even-Traverse Installations (Spacing>305 mm/12 in.)
(cont.)
2.
Place the yoke on the top of the pipe (see Figure 36 below). If the required
transducer spacing is <305 mm/12 in., the yoke chain must be placed
within the clamping fixture as shown.
3.
Wrap the yoke chains around the pipe and secure them to the yoke bracket,
as shown in Figure 37 below.
®
TransPort
PT900 User's Manual
Figure 36: Yoke Placement On Top of Pipe
Figure 37: Yoke Chains Secured
Chapter 2. Installation
29

Advertisement

Table of Contents
loading

Table of Contents