Suzuki Grand Vitara XL-7 Service Manual page 52

Hide thumbs Also See for Grand Vitara XL-7:
Table of Contents

Advertisement

3E-2 REAR SUSPENSION
1
REAR AXLE HOUSING
INSTALLATION
For the details, refer to the same item of the same section in the Ser-
vice Manual mentioned in the FOREWORD of this manual noting
following points.
D Clean mating surfaces of axle housing (1) and differential carrier
and apply sealant "A" to housing side.
"A": Sealant 99000-31110
D Install differential carrier assembly to axle housing and tighten
carrier bolts to specified torque.
Tightening torque
Differential carrier bolt (a): 55 N
D Apply thread lock cement to thread of propeller shaft flange bolt
if reused. Install propeller shaft to joint flange aligning match
marks and torque flange bolts or nuts to specification.
"A": Cement 99000-32110
Tightening torque
Propeller shaft bolt or nut (a): 60 N
(a), "A"
.
m (5.5 kg-m, 40.0 lb-ft)
.
m (6.0 kg-m, 43.5 lb-ft)

Advertisement

Table of Contents
loading

Table of Contents