27) Apply grease to straight pin (1) and install straight pin (1) to re-
verse gear shift link comp. (2).
"A": Grease 99000-25010
28) Insert 5th reverse guide shaft (3) into intermediate case.
29) Install stopper (1) to intermediate case.
"A": Cement 99000-32110
Tightening torque
Stopper mounting bolt (a): 25 N
30) Install ball (1), compression spring (2) and straight plug (3).
"A": Cement 99000-32110
Tightening torque
Straight plug (a): 25 N
31) Install interlock pin (1) by using magnet (2).
32) Apply grease to straight pin (1) and install straight pin (1) to high
gear shift shaft (2).
"A": Grease 99000-25010