Overview Of Configuration - ABB ScreenMaster RVG200 Operating Instructions Manual

Paperless recorder
Hide thumbs Also See for ScreenMaster RVG200:
Table of Contents

Advertisement

ScreenMaster RVG200
Paperless recorder

7.4 Overview of configuration

Referring to Fig. 7.4, configure the recorder as follows:
a
Touch the required icon in the system configuration menu.
Note. Only enabled process groups (and their associated channel options) and enabled software
options (for example, Math and Logic) are visible in the menu.
b
Touch the edit button to select and edit the required parameter(s).
c
Touch the next tab required and repeat step
d
2
Repeat steps
e
When all changes are complete, touch
f
Touch the next configuration icon required and repeat steps
g
When all configuration changes are complete, touch
Section 7.6, page 66).
1
Fig. 7.4 Overview of configuration steps
OI/RVG200-EN
3
and
as required.
6
2
.
to return to the system configuration menu.
2
to
to exit the Configuration level (refer to
7
7 Configuration
5
.
2
3
5
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents