3.1.7 Installation Drawings

3.2 Installation Step 2: Optional Mounting Method

3.2.1 Rack Mounting

The VC4™ Rack Kit includes two custom slides and hardware for installation in a customer-
supplied standard 19 inch rack.
RISK of equipment damage. Verify power is Off before disconnecting customer I/O
board.
Follow these points when installing the rack mount:
1. Verify proper clearances and dimensions for instrument placement.
2. Allow 9.00 inch (23 cm) height between units for proper clearance.
3. Refer the figure for right side fastener locations. Left side installation is identical.
VC4™
CAUTION
23