Loop circuit tests
Loop short circuit test
A loop short circuit isolation test should be carried out at this stage. It is recommended that the
sounders are switched On before conducting this test.
LOOP CABLE
PANEL
enclosure
BOARD
TERMINALS
L 1
0V
SHORTING LINK
End 1 Short test
¨
Create a short circuit by wiring a link across the loop terminals at End-1. There
should be no loss of any part of the system. The display should read:
Wiring changed - short at card x number y loop z
Wiring changed - loop split
¨
After rectification (removal of the short circuit) you will need to [Repair] the loop
circuit.
End 2 and Mid circuit Short test
¨
A short circuit test should then be repeated at End-2 and again at mid point of the
loop.
¨
After each test carry out rectification (remove the short circuit) you will then need to
[Repair] the loop circuit, see page 62 .
4188-856_issue 7_07/15_Generic Vigilon (Compact + VA) Comms.
Vigilon 4/6 loops & Compact (VA) panels & network nodes
Ground break test
A ground break test should be carried out at this stage:
¨
Disconnect the 0V line from End-1 of a loop circuit.
LOOP CABLE
REMOVE THE 0V
LINE TO
INTRODUCE A
GROUND BREAK
PANEL
enclosure
BOARD
BOARD
TERMINALS
L1
0V
"
A single 0V line break should not cause the loss of any part of the system.
End 1 cable break test
¨
The cable break may have to be sustained for up to a minute. The display should read:
Wiring changed - ground break at card x number y on loop z
¨
To clear the fault, the 0V line should be reconnected and then the loop should be
repaired using the [Repair] function at the panel.
End 2 loop break test
¨
The ground break test should be repeated at the other end of the loop circuit, End-2
and again at Mid point of the loop.
"
The exact location of a ground break is not indicated at the panel, however the
loop will run as normal.
¨
To clear the fault, the 0V line should be reconnected and then the loop should be
repaired using the [Repair] function at the panel, see page 62.
63