Commissioning instructions

Battery installation

"
The panel makes use of sealed lead acid type batteries which can have a
useful life of 5 years or more from the date of manufacture. It is strongly recommended
that batteries are replaced after 4 years of use. All batteries must be disposed of as per
recommendation made by battery manufacturer.
&
Always use the recommended replacement battery. As there is a risk of
an explosion if incorrect batteries are used.
VIG1-24 panel battery installation
Red
Black
P20
Red
Black
White
30
It is recommended that the mains supply to the panel
It is recommended that the mains supply to the panel
is switched
is switched
Off
Off
during battery installation.
during battery installation.
Fit the bolt, spade connector, washer, spring washer to
Fit the bolt, spade connector, washer, spring washer to
each battery terminal, as shown.
each battery terminal, as shown.
Insert the battery on the right into the back box.
Insert the battery on the right into the back box.
Insert the battery on the left into the back box.
Insert the battery on the left into the back box.
Fit the 'White' link lead to outer + and - spade connectors
Fit the 'White' link lead to outer + and - spade connectors
on the two batteries, as shown.
on the two batteries, as shown.
Fit the battery lead assembly (red & black) to the
Fit the battery lead assembly (red & black) to the
remaining + and - spade connectors on the two
remaining + and - spade connectors on the two
batteries, observe polarity.
batteries, observe polarity.
Plug the plug on the battery lead to connector P20 located
Plug the plug on the battery lead to connector P20 located
on the bottom left of power supply PCB.
on the bottom left of power supply PCB.
The panel will only power up after the mains supply
The panel will only power up after the mains supply
is switched On.
is switched On.
VIG1-72 panel battery installation
It is recommended that the mains supply is switched
Off
during battery installation.
Red
Black
Ensure the batteries are held in place while they
are being wired. Ensure the battery terminals
do not come into contact with the metal enclosure.
Place the two batteries on the lower shelf and lay them
horizontally with terminals facing outwards.
Fit the bolt, spade connector, washer and spring
washer to each battery terminal as shown above.
White.
Red
Black
Fit the white link lead and then fit the red/black
fused lead to the battery terminals, as shown above.
Raise the two batteries to an upright position
and push them back into the enclosure.
Black
Red
White.
Route the battery red/black lead through hole in the shelf
of the battery box and fit the connector end of the lead
to the PCB, located on the top right side.
Place two more batteries 'B' onto the lower shelf and
j n
repeat procedures
to
.
Where required, add further four batteries onto the
j o
upper shelf, use procedures
to
. The only
exception is that the red/black lead is directly connected
to the respective upper connectors on the PCB.
The panel will only power up after the mains supply
is switched
On
.
4188-856_issue 7_07/15_Generic Vigilon (Compact + VA) Comms.
4 - 12V 21Ah batteries
Battery Box
Upper
TH+
BT1+
BT2+
TH-
BT1-
BT2-
shelf
P6
P4 P3
P1
P2
TH1
Lower
shelf
A
B
8 - 12V 21Ah batteries
Battery Box
Upper
TH+
BT1+
BT2+
TH-
BT1-
BT2-
shelf
P6
A
P4 P3
P1
TH1
B
Lower
shelf
A
B
In-line fuse rated 10A QB ceramic 20mm x 5mm
P2