NEC NovaScale R480 E1 User Manual page 295

Table of Contents

Advertisement

4.
Slowly pull out the server from the rack.
The server is latched when a "click" is heard.
To push the server into the rack, lift the green release levers at both sides of the rail (using a screw driver) to
unlatch the server. Make sure your fingers do not get caught in the process.
IMPORTANT:
Push each release lever using a screwdriver or a similar tool. Pushing a release lever
with your fingers may cause serious injuries.
Two release levers are provided on each side of the rail. Release only the green levers.
9-11
Release lever

Advertisement

Table of Contents
loading

Table of Contents