Workflow From Installation To Operations - JVC VR-X3200U Instructions Manual

Hide thumbs Also See for VR-X3200U:
Table of Contents

Advertisement

Getting Started
Workflow from Installation
to Operations
The workflow from installation of this unit to system operations is as follows.
Caution:
● Install the network cameras and set the IP addresses, etc. before installation and setup of this unit.
Install
Connect
For operators
and
administrators
Switch on the power of this unit
Connect this unit to the network
Configure basic system settings
Configure settings for specific
operation type
Use the viewer
Operate
For monitoring
operators
Maintenance and system expansion
For operators
and
administrators
18
Install this unit to an EIA rack or the like.
Connect devices necessary to operate this unit such as a monitor
and a mouse, and devices essential to configure the security
system such as a network cable and other warning system(s).
After connecting necessary devices, switch on the power of this
unit.
Make the network settings on the unit, and connect it with the
cameras and computer.
Register the cameras and configure settings to show images from
the cameras on the screen.
Configure settings for the intended purpose.
Set the contents to be displayed in the view in accordance with the
surveillance plan.
Use the viewer to view live images from the cameras and search for
recorded images to play back.
Save recorded images to Desktop or other locations as necessary.
System maintenance and configuration changes (addition of
camera and HDD, etc.) are possible. For the list of setup items of
this unit and Milestone application, refer to the "Reference."
Page 24
Page 25
Page 29
Page 31
Page 32
Page 38
Page 130
Page 130
Page 78
Page 161

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vr-x1600u

Table of Contents