Replacing A Branch Monitoring Module - Huawei FusionPower6000 Maintenance Manual

Hide thumbs Also See for FusionPower6000:
Table of Contents

Advertisement

FusionPower6000
Maintenance Guide

6.8 Replacing a Branch Monitoring Module

Prerequisites
Procedure (MCCB Output Module)
Step 1 Mark the corresponding port names on the cables of the branch monitoring
module, and remove the cables (if any).
Step 2 Loosen the captive screws on the old branch monitoring module, and pull the
handle outwards to remove the module from the subrack.
Figure 6-15 Removing the branch monitoring module
Step 3 Connect the new branch monitoring module to the MCCB output module and
reconnect the cables (if any).
----End
Procedure (Standalone Installation)
Step 1 Mark the corresponding port names on the cables of the branch monitoring
module, and remove the cables (if any).
Step 2 Loosen the captive screws on the old branch monitoring module and remove the
module.
Issue 02 (2022-07-18)
Tools: ESD wrist strap, ESD gloves, Phillips screwdriver, label, marker
Material: a new and intact branch monitoring module of the same model
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 Component Replacement
52

Advertisement

Table of Contents
loading

Table of Contents