Ipower Intelligent Management; Edge Data Center Management - Huawei FusionPower6000 Maintenance Manual

Hide thumbs Also See for FusionPower6000:
Table of Contents

Advertisement

FusionPower6000
Maintenance Guide

7.8.6.2 iPower Intelligent Management

For details, see
Center)
Step 1 Install and log in to the NetEco management system.
Step 2 Add devices.
Step 3 Load licenses.
Step 4 Set the iPower intelligent management features.
iPower Intelligent
Feature
AI-based predictive
maintenance of power
supply and
distribution links
Low-voltage switch
setting
----End

7.8.6.3 Edge Data Center Management

For details about the edge data center management (EDCM) service, see the
operation guide on the Huawei Cloud official website.
To use the EDCM service, you need to register a Huawei Cloud account and
complete real-name authentication.
No.
1
2
Issue 02 (2022-07-18)
(For Customer) iMaster NetEco Product Documentation (Data
(V600R022C10).
NO TICE
Task
Description
Logging in
Log in to the NetEco to
to and out
check that the service can
of the
be accessed properly.
NetEco
Setting
The ECC800-Pro can
NetEco
connect to the NetEco only
communica
after you set NetEco
tions
communications
parameters
parameters on the ECC800-
on the
Pro WebUI.
ECC800-Pro
Copyright © Huawei Digital Power Technologies Co., Ltd.
Description
A license is required. This feature visualizes the
temperature prediction of the power supply and
distribution links and analyzes the impact on the links.
A license and an ACB Ekip COM communication
module are required. This feature allows you to browse
and configure switch setting parameters to set switches
and deliver the settings.
Operation Guide
EDCM Product
Documentation
> User
Guide > Getting Started
7 FAQ
108

Advertisement

Table of Contents
loading

Table of Contents