Installing Option Modules - ABB ACS560 Quick Installation And Start-Up Manual

Hide thumbs Also See for ACS560:
Table of Contents

Advertisement

132 Electrical installation
c. मॉड् य ू ल को खीं च े ं और इसे हटा दे ं ।
टिप् प णी

Installing option modules

मॉड् य ू ल कसकर स् थ िति मे ं हो सकता है ।
Note: In US deliveries, options are already installed at the factory.
3. Align the BIO-01 module with the option module slot in the front of the drive.
Note: If you will install the FPBA
4. Push the BIO-01 option module into position.
adapter module connectors
Mechanical installation of option modules
5. लॉकिं ग पे ं च कस ले ं ।
See section
Overview of power and control connections
टिप् प णी
slots for each module. Install the option modules as follows:
If required, you can install fieldbus module on top of the BIO-01 module.
BIO-01 और अन् य विकल् प मॉड् य ू ल अधिक जानकारी के लिए, हार् ड वे य र मै न ु अ ल मे ं अध् य ाय विद् य ु त स् थ ापना
WARNING! Obey the instructions in chapter
दे ख े ं ।
you ignore them, injury or death, or damage to the equipment can occur.
Note: Slot 2 in frames R1...R5 is at U
supplies before installing or removing an I/O extension module.
Stop the drive and do the steps in section
b
a
01 module, see section
-
on page
77
3
6
DC
HI -त् व रित इं स ् ट ाले श न और स् ट ार् ट -अप गाइड 141
FPBA-01 PROFIBUS DP
for suitable connector types.
4
page
Safety instructions
potential. You must disconnect power
Precautions before electrical work
िव य ु त
EN
HI
34
for the available
on page 13. If
on page

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents