5.
Issue 01 (2021-04-20)
Figure 4-10 Removing the smart cooling product communications cable and
water sensor
X302-1/2/3: RS485 communications control
port for the outdoor unit
Remove the teamwork control cable from the FE_1 port on the smart cooling
product main control module.
Copyright © Huawei Technologies Co., Ltd.
4 Parts Replacement
X301-7/8: water sensor port