FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario)
Figure 4-2 Removing a suspended ceiling
1.
2.
3.
Step 4 Remove the ESD floors under the front and rear of the smart cooling product.
Figure 4-3 Removing ESD floors
Issue 01 (2021-04-20)
Remove the sealing ring in the suspended ceiling above the front of the smart
cooling product.
Remove the bolts securing the suspended ceiling using a Phillips screwdriver.
Two persons work together to push up the suspended ceiling at the cabinet
side to unhook the suspended ceiling, and remove the suspended ceiling from
the lower right corner.
Copyright © Huawei Technologies Co., Ltd.
4 Parts Replacement
60