Samsung OfficeServ 7200 Technical Manual page 3

Hide thumbs Also See for OfficeServ 7200:
Table of Contents

Advertisement

Table of Contents
Home Page
OfficeServ 7200
INSTALLATION
TECHNICAL MANUAL
TABLE OF CONTENTS SEPTEMBER 2005
FIGURE 3.2: Switch Setting
FIGURE 3.3: Installing the Processor Board (1)
FIGURE 3.4: Installing the Processor Board (2)
FIGURE 3.5: Link Cables
FIGURE 3.6: Connecting MCP Board to LCP Board
FIGURE 3.7: Front View of the MCP
FIGURE 3.8: Front View of the LCP
FIGURE 3.9: Installing Optional Boards
FIGURE 3.10: Installing Interface Board into Slot
FIGURE 3.11: Front Panel Lever
FIGURE 3.12: Turning the Cabinet Power Off
FIGURE 3.13: Removing Cable
FIGURE 3.14: Removing Board
FIGURE 3.15: Replacing to New Board
FIGURE 3.16: Setting Switches on the TEPRI Board
FIGURE 3.17: Front View of the TEPRI
FIGURE 3.18: Front View of the 8TRK
FIGURE 3.19: Front View of the 16DLI2
FIGURE 3.20: Front View of the 8DLI
FIGURE 3.21: Front View of the 8COMBO
FIGURE 3.22: Front View of the 16SLI2
FIGURE 3.23: Front View of the 8SLI
FIGURE 3.24: Jumper Setting of WIM Board
FIGURE 3.25: Front View of the WIM Board
FIGURE 3.26: V.35 Cable Pin Outs
FIGURE 3.27: SIO Connector, RJ45 Pin Assignment
FIGURE 3.28: Front View of the LIM Board
FIGURE 3.29: Mounting Optional Board on MGI Board
FIGURE 3.30: Front View of the MGI Board
FIGURE 3.31: Front View of the 4WLI Board

Advertisement

Table of Contents
loading

Table of Contents