The procedure for installing the MCP board and the LCP board to each slot is as
follows:
1) Check the exterior of the MCP board and the LCP board for any damage. If damage
is found, do not proceed with installation. Contact Samsung Technical Support.
Power the system OFF when installing or removing boards.
POWER TO THE CABINET MUST BE TURNED OFF. Failure to do so will
damage the card, cabinet and/or corrupt the data moving along the data bus.
2) Align the MCP board to the guardrails of slot 0 of the Main Cabinet, and slide the
MCP board into the slot.
3) Push the front panel lever until the board is completely inserted into the OfficeServ
7200 slot 0.
4) The above steps 2~3 also apply to installing the LCP board to slot 0 of the
expansion cabinet.
Figure 3.3 Installing the Processor Board (1)
Figure 3.4 Installing the Processor Board (2)