Huawei iBAT 2.0-CIM01C2 User Manual page 66

Hide thumbs Also See for iBAT 2.0-CIM01C2:
Table of Contents

Advertisement

iBAT 2.0-CIM01C2
User Manual
Item
BIM connection
CIM connection
If the fault persists, contact Huawei technical support.
Issue 07 (2019-01-02)
Expected Result
The BIM is attached
firmly.
All BIM cables are
securely connected.
No BIM cable
deteriorates and the
insulation layer does not
crack.
The CIM is attached
firmly.
The cable to the PoE port
is connected securely.
If a cable connects to the
COM port, check that the
cable connection is
secure.
If a cable connects to the
BCB port, check that the
cable connection is
secure.
The cable to the HALL
current monitoring port
is connected securely.
Copyright © Huawei Technologies Co., Ltd.
9 Maintenance
Troubleshooting
Secure the BIM again.
Verify that all BIM
cables are securely
connected.
Replace the faulty cable.
Secure the CIM again.
Reconnect the cable to
the PoE port.
Reconnect the cable to
the COM port.
Reconnect the cable to
the BCB port.
Reconnect the cable to
the HALL current
monitoring port.
60

Advertisement

Table of Contents
loading

Table of Contents