Huawei iBAT 2.0-CIM01C2 User Manual page 39

Hide thumbs Also See for iBAT 2.0-CIM01C2:
Table of Contents

Advertisement

iBAT 2.0-CIM01C2
User Manual
Procedure
Step 1 Connect the CIM signal cables.
Figure 4-2 Connecting the CIM signal cables
Step 2 (Optional) If there are multiple CIMs, connect each CIM to the smart ETH gateway separately.
The method of connecting cables between the CIM and southbound components are the same.
----End
Issue 07 (2019-01-02)
In the foregoing figure, the iBOX is equivalent to the CIM, and the iBAT is equivalent to the BIM.
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Cables
33

Advertisement

Table of Contents
loading

Table of Contents