Huawei iBAT 2.0-CIM01C2 User Manual page 33

Hide thumbs Also See for iBAT 2.0-CIM01C2:
Table of Contents

Advertisement

iBAT 2.0-CIM01C2
User Manual
M6: 4–6 N· m
M8: 13–15 N· m
M10: 15–20 N· m
(1) Bolt
(4) OT terminal
2.
(1) Strip the adhesive tape from the BIM
fastener.
3.
Issue 07 (2019-01-02)
Figure 3-10 Connecting battery cables
Install a battery bolt in the following sequence: bolt > spring washer > flat washer > OT terminal >
battery connecting piece.
Secure the BIM.
Figure 3-11 Securing a BIM
After connecting all power cables to the system, connect the cable to the BIM.
Copyright © Huawei Technologies Co., Ltd.
(2) Spring washer
(5) Battery connecting piece
(2) Attach the BIM and press it for more than
10 seconds.
3 Installing Devices
(3) Flat washer
27

Advertisement

Table of Contents
loading

Table of Contents