Huawei iBAT 2.0-CIM01C2 User Manual page 61

Hide thumbs Also See for iBAT 2.0-CIM01C2:
Table of Contents

Advertisement

iBAT 2.0-CIM01C2
User Manual
Switching iBAT Numbers
Figure 7-9 Switching iBAT numbers
Switch No.1: Indicates the switching number 1 corresponding to the operation type Switch
iBAT No. Switch No.2: Indicates the switching number 2 corresponding to the operation type
Switch iBAT No.
Example: There are three iBATs in the network and they are numbered 1, 2, and 3. Choose
Switch iBAT No., set Switch No.1 to 2, and set Switch No.2 to 3. After the operation, the
iBAT numbers 2 and 3 are switched.
Figure 7-10 Schematic diagram
Issue 07 (2019-01-02)
Copyright © Huawei Technologies Co., Ltd.
7 iBAT Networking Configuration
55

Advertisement

Table of Contents
loading

Table of Contents