3.
Step 5 After the installation is complete, connect a network cable, a VGA cable, or USB devices as
required. Connect the power cables and power on the 5288 V3.
----End

3.4.2 Installing the Server on Adjustable Guide Rails

Adjustable guide rails apply to a cabinet with a distance of 543.5 mm to 848.5 mm (21.40 in.
to 33.41 in.) between the front and rear mounting bars.
Procedure
Step 1 Install adjustable guide rails.
1.
Issue 26 (2018-11-19)
Figure 3-7 Installing the 5288 V3
When the two mounting ears of the 5288 V3 come into contact with the mounting bars
on the cabinet, tighten the captive screws on the mounting ears to secure the 5288 V3.
See step (2) in
Figure
3-7.
Use a screwdriver to fasten one dowel pin on front and two dowel pins on the rear of the
guide rail.
Figure 3-8
shows the positions of dowel pins.
NOTE
Three types of dowel pins are shipped with the guide rails, and their diameters are 6.8 mm (0.27
in.), 8.7 mm (0.34 in.), and 9.2 mm (0.36 in.). Choose dowel pins with the largest diameter that
can pass through the holes.