  • Page 2: Installation Process

    Installation Process Start Preparation for Page 2 to 3 Installation Page 4 to 5 Installing the Server Installing the Power Page 6 to 7 Cables Installing the Signal Page 8 to 12 Cables Checking the Page 13 Installation Powering On/Off the Page 14 Server 2015...
  • Page 3: Preparation For Installation

    Notice This document describes how to install the server, how to connect the power cables and signal cables, and how to check the connections when the Huawei RH2288H V3, and RH5885H V3 server act as the server of eSight. The power cable connection and signal cable connection that are detailed in this document are written according to the standard configuration.
  • Page 4 Tools Phillips Screwdriver Flat-head Screwdriver Mount Bar Wire Stripper Diagonal Pliers RJ45 Crimping Tool Measuring Tape Multimeter Network Cable Tester Tie Wrap ESD Gloves ESD Wrist Strap The tools for installation are not delivered along with the device. Please provide for yourself.
  • Page 5: Installing The Server

    Installing the Server Installing the Server on Adjustable Guide Rails (Applies to All Cabinets) • Each server must be supported by guide rails. Stacking one server on another will cause server damage. • Guide rails are divided into left and right guide rails (labeled with L and R). A pair of guide rails should be installed together and cannot be installed reversely.
  • Page 6 • Each server must be supported by guide rails. Stacking one server on another will cause server damage. • L-shaped guide rails can only be used in a Huawei cabinet. L-shaped guide rails are delivered with Huawei racks. No L-shaped guide rails are delivered with the server.
  • Page 7: Installing The Power Cables

    Installing the Power Cables Connecting an AC Power Cable • Do not connect the power cables when the power-supply device is powered on. Instead, switch off the power-supply device to avoid injuries. • To protect devices and personnel, use the matching power cables. Connect the one end of the AC power cable to the power port on the PSU of server.
  • Page 8 Connecting a DC Power Cable (RH5885H V3 Server) Do not connect the power cables when the power-supply device is powered on. Instead, switch off the power-supply device to avoid injuries. Connect the ground cable. a. Use a Phillips screwdriver to loosen the screw in the ground hole on the rear of the server, and connect one end of the ground cable to the removed screw.
  • Page 9 Installing the Signal Cables Interfaces of the RH2288/RH5885 Server RH2288H V3 server (rear view) RH5885H V3 server (rear view) The position of each interface on the preceding devices varies with actual devices. The pictures in this document are referential to describe the installation procedure of the device. If the pictures are different from the delivered devices, take the delivered devices as the standard.
  • Page 10 Single-Node System Network Cable Connection • Connect network ports of the server to the switch based on the actual networking. In a single-node system, connect at least one network port. • To remotely manage the server, connect the Mgmt management port of the server to the switch. RH2288H V3 RH5885H V3...
  • Page 11 Local HA System Network Cable Connection • Connect network ports of the server to the switch based on the actual networking. In a local HA system, connect at least four service network ports. Network ports 1 and 3 can be bonded as the system or application private line. Network ports 2 and 4 can be bonded as the heartbeat or duplication private line.
  • Page 12 Remote HA System Network Cable Connection • Connect network ports of the server to the switch based on the actual networking. In a remote HA system, connect at least four service network ports. Network ports 1 and 3 can be bonded as the system or application private line. Network ports 2 and 4 can be bonded as the heartbeat or duplication private line.
  • Page 13 Laying Network Cables Lay network cables inside the cabinet. Bundle network cables at 20-cm intervals to tidy up cables in the cabinet. Lay network cables underground Lay network cables overhead between cabinet. between cabinets.
  • Page 14: Checking The Installation

    Checking the Installation Checking the Installation of Power Cables Item All the power cables and PGND cables are copper-core cables. There are no solder joints or connectors in the power cables and the PGND cables. There is no breaking equipment such as switches and fuses in the electrical connection of the grounding system.
  • Page 15: Powering On/Off The Server

    Powering On/Off the Server Powering On the Server • Before powering on the server, ensure that the power switch is off. • During power-on, do not plug or insert a hard disk, network cable, or serial port cable. • After the server is powered off, wait at least 1 minute before powering on the server again. Check cable connections.
  • Page 16 Changes in Documentation Updates in Issue 01 (2015-12-30) This issue is the first official release.