Installing a bbu

Advertisement

Quick Links

BBU Quick Installation Guide
Installing a BBU
a
Installing a BBU Subrack
NOTE
• Wear ESD wrist strap or ESD gloves to prevent electrostatic damage to the subrack.
• Only when the BBU install in TP48200A and APM30H cabinets, subrack cable claws are configured. Other
cabinets carry on next step directly.
1. Install cable claws on the two sides of the
BBU.
b
Installing Boards and Modules
1. The following figure shows the slots in the subrack for installing boards and modules.
Slot16
(FANe)
Slot3(UBBP/LBBPd4)
NOTE
The figure shows only installation slots for the main processing board, core network processing board,
baseband processing board, fan module, and power module in the typical configuration. If you need to install
the USCUb22, UEIU, or UFLP, see "Installing Boards and Modules" in eNodeB Product Documentation.
2. Insert the boards and modules into the correct slots and secure screws on the panel.
Slot0
Slot1
Slot2
2. Side the BBU along the guide rails into the
cabinet and secure screws on the panel.
Slot4
Slot5
Slot6(CNPUb/CNPU)
Slot7(UMPT/LMPT)
1
V100R005C10 03
Slot18
Slot19
(UPEUd)

Advertisement

loading

Summary of Contents for Huawei V100R005C10

  • Page 1 BBU Quick Installation Guide V100R005C10 03 Installing a BBU Installing a BBU Subrack NOTE • Wear ESD wrist strap or ESD gloves to prevent electrostatic damage to the subrack. • Only when the BBU install in TP48200A and APM30H cabinets, subrack cable claws are configured. Other cabinets carry on next step directly.
  • Page 2: Installing Cables

    Installing a GPS SPD NOTE Here is the process of binding a GPS SPD in the TP48200A cabinet. For details about how to install a GPS SPD in other scenarios, please see “(Optional) Installing a GPS SPD” in eNodeB Product Documentation. 1.
  • Page 3 Installing Cables Installing a Power Cable NOTE Here is the process of installing a BBU power cable in the TP48200A cabinet. For details about how to install a BBU power cable in other scenarios, please see “Installing a BBU Power Cable”...
  • Page 4 Installing Cables Connecting Ethernet Cables or Optical Fibers to the Main Processing Board c2 Installing an FE/GE Ethernet Cable 1. Connect the RJ45 connector at one end of the Ethernet cable to the FE/GE0 port on the UMPT/LMPT, the FE/GE1 port on the LMPT, or the FE/GE2 port on the UMPTe3.
  • Page 5 Installing Cables Installing the GPS Antenna System and Cables NOTE The GPS antenna can be installed under a tower or on a tower. Here is the process of installing a GPS antenna under a tower. For details about how to install a GPS antenna on a tower, see “Installing a GPS Antenna on a tower”...
  • Page 6: Checking The Hardware Installation

    Checking the Hardware Installation Check Items for Cable Installation Check Item All cables are connected securely and reliably. Pay special attention to the communication cable connections and cable connections at the bottom of the cabinet. Different types of cable, such as power cables, PGND cables, feeders, optical fibers, and signal cables are separately bound.
  • Page 7 Appendix Assembling the OT Terminal and the Power Cable 1. Strip the sheath off the cable to leave the 2. Lead the cable through the heat shrink conductor with an L1 length exposed. Ensure tubing and place the OT terminal on the that the value of L1 is equal to the tail length of exposed conductor.