ETL600
Fig. 6-12
Earth rail R9AL mounted in the bottom rear of the channel subrack P7LC
All cables are mechanically secured to the earth rail by plastic cable
binders. Shield clamps are used to galvanically connect the cable
shields to the earth rail.
Assembly and Installation
1KHW001489-EN
November 2005
ABB Switzerland Ltd
6-13