Manuals and User Guides for ABB REL 505-C1 2.3 Series. We have
1
ABB REL 505-C1 2.3 Series manual available for free PDF download: Installation And Commissioning Manual
ABB REL 505-C1 2.3 Series Installation And Commissioning Manual (118 pages)
Overcurrent protection terminal
Brand:
ABB
| Category:
Touch terminals
| Size: 0.98 MB
Table of Contents
Table of Contents
3
Chapter 1 Introduction
7
Introduction to the Installation and Commissioning Manual
8
About the Complete Set of Manuals to a Terminal
8
About the Installation and Commissioning Manual
9
Intended Audience
9
Related Documents
10
Revision Notes
10
Chapter 2 Safety Information
11
Warning Signs
12
Caution Signs
14
Note Signs
15
Chapter 3 Overview
17
Commissioning and Installation Overview
18
Chapter 4 Unpacking and Checking the Terminal
19
Receiving, Unpacking and Checking
20
Chapter 5 Installing the Terminal
21
Overview
22
Mounting the Terminal
23
Mounting in a 19-Inch Rack
24
Mounting in a 19-Inch Rack with an Additional Box Type RHGS
25
Mounting in a Flush or Semi-Flush Installation
27
Mounting on a Wall
30
Making the Electrical Connections
32
Connecting the CT Circuits
32
Connecting the Auxiliary Power, VT and Signal Connectors
32
Connecting to Protective Ground
33
Making the Screen Connection
33
Installing the Optical Fibres
34
Chapter 6 Checking the External Circuitry
35
Overview
36
Checking the CT and VT Circuits
37
Checking the Power Supply
38
Checking the Binary I/O Circuits
39
Binary Input Circuits
39
Binary Output Circuits
39
Energising the Terminal
41
Overview
42
Energising the Terminal
43
Checking the Self Supervision Signals
44
Reconfiguring the Terminal
44
Setting the Terminal Time
44
Checking the Self Supervision Function
45
Self Supervision HMI Data
45
Setting and Configuring the Terminal
47
Overview
48
Entering Settings through the Local HMI
49
Downloading Settings and Configuration from a PC
50
Establishing Front Port Communication
50
Establishing Rear Port Communication
50
Downloading the Configuration and Setting Files
52
Establishing Connection and Verifying the SPA/IEC- Communication
53
Entering Settings
54
Entering SPA Settings
54
Entering IEC Settings
54
Verifying the Communication
56
Verifying SPA Communication
56
Verifying IEC Communication
56
Chapter 10 Verifying Settings by Secondary Injection
57
Overview
58
Preparing for Test
60
Overview
60
Preparing the Connection to the Test Equipment
60
Setting the Terminal in Test Mode
61
Connecting Test Equipment to the Terminal
61
Verifying the Connection and the Analog Inputs
62
Releasing the Function(S) to be Tested
63
Checking the Disturbance Report Settings
64
Current Reversal and Weak End Infeed Logic for Distance Protection (ZCAL)
66
Current Reversal Logic
66
Weak End Infeed Logic
67
Completing the Test
68
Current Reversal and Weak End Infeed Logic for Residual Overcurrent Protection (EFCA)
69
Testing the Current Reversal Logic
69
Testing the Weak-End-Infeed Logic
69
Completing the Test
71
Definite and Inverse Time-Delayed Residual Overcurrent Protection (TEF)
72
Checking the Operate Values of the Current Measuring Elements
72
Event Function (EV)
76
Event Recorder
77
Fuse Failure Supervision (FUSE)
78
Checking that the Binary Inputs and Outputs Operate as Expected
78
Measuring the Operate Value for the Negative Sequence Function
79
Measuring the Operate Value for the Zero Sequence Function
80
Checking the Operation of the Du/Dt, DI/Dt Based Function
81
Completing the Test
82
High Speed Binary Output Logic (HSBO)
83
HSBO- Trip from Communication Logic
83
HSBO- Trip from the High-Speed Function (HS)
85
HSBO- Trip from the Distance Protection Zone 1 Function (ZM1)
86
Completing the Test
87
Instantaneous Overcurrent Protection (IOC)
88
Measuring the Operate Limit of Set Values
88
Completing the Test
89
Monitoring of AC Analogue Measurements
90
Monitoring of DC Analogue Measurements
91
Setting Lockout (HMI)
93
Scheme Communication Logic for Distance Protection Functions (ZCOM)
94
Testing Permissive Underreach
94
Testing Permissive Overreach
95
Testing Blocking Scheme
95
Checking of Unblocking Logic
96
Completing the Test
96
Scheme Communication Logic for Residual Overcurrent Protection (EFC)
97
Testing the Directional Comparison Logic Function
97
Completing the Test
98
Setting Group Selector (GRP)
99
Time Delayed Overcurrent Protection (TOC)
100
Measuring the Operate Limit of Set Values
100
Completing the Test
101
Trip Logic (TR)
102
3Ph Operating Mode
102
1Ph/3Ph Operating Mode
102
1Ph/2Ph/3Ph Operating Mode
103
Completing the Test
104
Two Step Time Delayed Directional Phase Overcurrent Protection (TOC3)
105
Measuring the Operate and Time Limit for Set Values
105
Completing the Test
107
Two Step Time Delayed Phase Overcurrent Protection (TOC2)
108
Measuring the Operate and Time Limit for Set Values
108
Completing the Test
109
Chapter 11 Verifying the Internal Configuration
111
Overview
112
Testing the Interaction of the Distance Protection
113
Chapter 12 Testing the Protection System
115
Overview
116
Testing the Interaction of the Distance Protection
117
Advertisement
Advertisement
Related Products
ABB Protect IT REL 501 2.5 Series
ABB REL 551-C1*2.5
ABB REL 561*2.5
ABB REL 551-C1 2.3 Series
ABB REL 551 2.5
ABB REF 545
ABB RET 54 Series
ABB REB 551-C4 2.5 Series
ABB RET 541
ABB REL 501-C1 2.5
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL