Installing Optional Sfp Fiber Transceivers To The Switch; Installing Chassis To A 19-Inch Wiring Closet Rail - Draytek VigorSwitch P2261 User Manual

Poe 24+2 giga port l2 managed switch
Hide thumbs Also See for VigorSwitch P2261:
Table of Contents

Advertisement

P
o
w
e
r
P
o
w
e
r
The switch supports 100-240 VAC, 50-60 Hz power supply. The power supply will
automatically convert the local AC power source to DC power. It does not matter whether
any connection plugged into the switch or not when power on, even modules as well. After
the power is on, all LED indicators will light up immediately and then all off except the
power LED still keeps on. This represents a reset of the system.
w
F
i
r
m
w
F
i
r
m
After resetting, the bootloader will load the firmware into the memory. It will take about 30
seconds, after that, the switch will flash all the LED once and automatically performs
self-test and is in ready state.
1
.
5
.
2
I
n
s
t
a
l
l
i
n
1
.
5
.
2
I
n
s
t
a
l
l
i
n
If you have no modules, please skip this section.
1
.
5
.
3
I
n
s
t
a
l
l
i
n
1
.
5
.
3
I
n
s
t
a
l
l
i
n
Caution: Allow a proper spacing and proper air ventilation for the cooling fan at both
sides of the chassis.
1. Wear a grounding device for electrostatic discharge.
2. Screw the mounting accessory to the front side of the switch.
3. Place the Chassis into the 19-inch wiring closet rail and locate it at the proper position.
Then, fix the Chassis by screwing it.
VigorSwitch P2261 User's Guide
O
n
O
n
a
r
e
L
o
a
d
i
n
g
a
r
e
L
o
a
d
i
n
g
g
O
p
t
i
o
n
a
l
S
F
P
F
g
O
p
t
i
o
n
a
l
S
F
P
F
g
C
h
a
s
s
i
s
t
o
a
1
g
C
h
a
s
s
i
s
t
o
a
1
i
b
e
r
T
r
a
n
s
c
e
i
v
e
i
b
e
r
T
r
a
n
s
c
e
i
v
e
9
-
I
n
c
h
W
i
r
i
n
g
C
l
o
9
-
I
n
c
h
W
i
r
i
n
g
C
l
r
s
t
o
t
h
e
s
w
i
t
c
h
r
s
t
o
t
h
e
s
w
i
t
c
h
s
e
t
R
a
i
l
o
s
e
t
R
a
i
l
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vigorswitch g2260

Table of Contents