Power-Up Routine - GE ADTS 542 Instruction Manual

Air data test set
Table of Contents

Advertisement

Power-up routine

Make sure the power at the wall connection point is switched ON.
Wired connection
1)
Either position the ADTS Touch on the docking connector of the ADTS, or connect the ADTS
Touch to the ADTS using the umbilical cable connector.
2)
Set the On/Standby Switch on the front of the ADTS to ON.
The test set performs a self test, resulting in a test set status indication Pass or Fault
No LEDs
Yellow
Green (flashing)
Green
Red
Table 3-1: Test set status indications
If the self test fails (red Fault indication), or for any other reason the test set is considered to be unser-
viceable, contact GE and return the test set to the GE or GE approved service centre.
Test set status indications (4a):
OFF
Standby
Self test in progress
Pass
Fault
P
-
OWER
UP ROUTINE
52

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adts 552Adts 553Adts 554f

Table of Contents