GE ADTS 542 Instruction Manual page 180

Air data test set
Table of Contents

Advertisement

ADTS
LEAK CHECK
Vacuum leak check
This procedure verifies that the unit is leak tight under negative pressure conditions.
1)
Select CONTROL.
2)
Swipe across to select the Rate Timer and set the "WAIT" time to 5 minutes and 0 seconds and
touch the "tick" icon.
3)
Set the "TEST" time to 1 minute and 0 seconds and touch the "tick" icon.
4)
Swipe back to the control mode.
5)
Touch the Ps "AIM" value to highlight it.
6)
Use the numbered keypad to input the new value: 100.00mbar, set rate aim to 500mbar/min and
touch the "tick" icon.
7)
Touch the Qc "AIM" value to highlight it.
8)
Use the numbered keypad to input the new value: 0.00mbar, set rate aim to 500mbar/min and
touch the "tick" icon.
9)
Wait until the Ps and Qc have reached the "Aim" values and stabilized (indications will be green).
10) Select MEASURE.
11) Swipe across to select the Rate Timer.
12) To start the timer, touch the "play" icon. The timer starts counting down, the elapsed time
(percentage) indicator turns blue and the word "WAIT" is displayed.
13) When the timer reaches 100%, it starts to count down again and the word "TEST" is displayed.
When the timer reaches 100%, it stops, the elapsed time indicator remains blue and the word
"END" is displayed.
14) The display shows the timed rates with a "T" after each value. Check that the Ps, and Qc rates are
less than or equal to ±0.6 mbar/min. If the rates are greater than this value, allow further thermal
stabilization time and re-test.
If repeated failures occur, return the unit to GE or a GE authorised repair depot.
178

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adts 552Adts 553Adts 554f

Table of Contents