Download Print this page

Toshiba GR-200 Series Instruction Manual page 470

Multi functional protection ied
Hide thumbs Also See for GR-200 Series:

Advertisement

4.1-14 for PLC#2, Table 4.1-15 for PLC#3, Table 4.1-17 and Table 4.1-19 for output
signals.
Note: The "Operate failed" signal is issued when the state-change is not detected until
‡‡
after reaching the time set by the [DPOS01-RST].
Receiving "Operate command On" from the local-end
(iii)
Figure 4.1-23 depicts the reception of the operate command 'On' from the local-end.
Wait for a command
Select stage
Select command On from the remote-end
Select command Off from the remote-end
Select command On from the local-end
Select command Off from the local-end
Select command On by the PLC function
Select command Off by the PLC function
Figure 4.1-23 Outline of Operate command 'On'
Input signal generated at the local-end
Figure 4.1-24 illustrates the operate logic when an "Operate command signal On (Local-ON-
Control)" is applied to the DPOS01 function. The signal is generated when "Execution of On"
is keyed on the IED front panel.
Output signal to BO
The DPOS01 function, in Figure 4.1-24, can issue an "Operate" signal at the output point
"DPOS01_OEX_BO", when the DPOS01 function determines that the signal "Local-On-Control"
is true.
Wait for a next command
Operate command On from the local-end
Operate command Off from the local-end
Operate command On from the local-end
Operate logic
Signal reception from
the front panel
Operate command Off from the local-end
Operate command On by the PLC function
Operate command Off by the PLC function
- 451 -
6F2T0200 (0.15)
Success
Operation
Signal output
decision
Do nothing
Failed
GRE200 (1,2)

Advertisement

loading

This manual is also suitable for:

Gre200-1Gre200-2