Installation

Installation and Commissioning Flowchart

Identify the frame size of your drive, R7 or R8.
Plan the installation.
Check the ambient conditions, ratings, required
cooling air flow, input power connection, compatibility
of the motor, motor connection, and other technical
data.
Select the cables.
Unpack and check the units.
Check that all necessary optional modules and
equipment are present and correct.
Only intact units may be started up.
Check the installation site.
Check the insulation of the motor and the motor
cable.
If the drive is about to be connected to an IT
(ungrounded) system, check that the EMC filter is not
connected to the ground.
Route the cables.
Install the drive. Connect the power cables. Connect
the control and the auxiliary control cables.
Check the installation.
Commission the drive.
Task
See
Technical Data: Ratings
on page
application requirements
Installation
For compliance with the European Union EMC
Directive, see
Technical Data
Markings / C-Tick
186
on page
Option manual (if optional equipment is
included)
Installation
:
Moving the Unit
If the converter has been non-operational for
more than one year, the converter DC link
capacitors need to be reformed. Ask ABB for
instructions.
Installation: Before Installation
Technical Data
Installation: Checking the Insulation of the
Assembly
23
on page
Delivery Check
: Type code. For instructions on
how to disconnect the EMC filtering, contact
ABB.
Routing Instructions:
Routing the cables installation on
Resistor Braking (external), contact your local
ABB.
Installation Checklist
on page
User Manual
5
180
vs
:
CE / UL
on page 19.
on page
21
page 17
37
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs550-u2Acs550-01Acs550-u1

Table of Contents