FusionModule1000A20 IT Solution
Installation Guide (2016.05, AI Version)
Materials: water tank, pipe, valve, screws
Document: water tank and pipe layout diagram (prepared onsite)
Skill requirement: common technicians
Procedure
Step 1 Install the water tank on the platform and secure the tank.
Step 2 Install water pipes and control valves based on the water tank and pipe layout diagram.
----End
7.2.2 Installing a Water Pump
Prerequisites
Preparations
Tools: adjustable wrench, protective gloves
Materials: water pump, pipe, valve, screws
Document: water pump and pipe layout diagram (prepared onsite)
Skill requirement: common technicians
Procedure
Step 1 Install the water pump on the platform and secure the pump.
Step 2 Install water pipes and control valves based on the water pump and pipe layout diagram.
----End
Issue 02 (2017-01-10)
There is no requirement on the sequence for installing the water tank and water pump.
Apply anti-freezing measures in low-temperature areas. For details, see
A water pump is required in the onsite environment.
The water pump and pipe layout and installation platform has been planned.
A water pump and pipes that meet requirements have been prepared.
There is no requirement on the sequence for installing the water tank and water pump.
Apply anti-freezing measures in low-temperature areas. For details, see