Materials: containers to be hoisted, 3 mm thick spacers made of passivated 304 stainless steel
or hot-dip Q235 zinc (to be purchased onsite)
Document: container layout diagram
Skill requirement: skilled technicians, common technicians, and crane driver
Procedure
Step 1 Adjust the container in the installation direction, connect the steel hoisting ropes, and hoist the
container onto the bases.
Figure 5-7 Hoisting a 20 ft container
Step 2 After hoisting containers onto the bases, measure the levelness of the container using a level.
If the container is not level, level it using a jack and spacers.
Step 3 Turn the twistlocks in the bases by 90 degrees to lock the container and tighten the twistlocks
to a torque of 210 N· m using a torque wrench, as shown in
Before you tighten twistlocks, ensure that the twistlocks lock the container.
Issue 02 (2017-01-10)
For the diagram, see the quick installation guide for the solution in use.