Step 5 Connect the network cable reserved for the RH2288 server from the LAN switch to the eth0
port on the server through the cable manager.
Figure 9-23 Connected ports
----End
Follow-up Procedure
Verify the RH2288 server installation and ensure that RH2288 server cables are correctly
connected.

9.5.3 Installing a VCN500

Prerequisites
Required VCN500s have been obtained.
Preparations
Tool: Phillips screwdriver
Materials: VCN500
Documents: monitoring device installation position diagram, cabinet configuration tables
Skill requirement: common technician
Procedure
Step 1 Determine the number of VCN500s to be installed and the installation positions based on the
monitoring device installation position diagram and cabinet configuration tables.
Step 2 Take a VCN500 out of the fitting bag.
Step 3 Place floating nuts into the specified square holes.
Issue 02 (2017-01-10)
The RH2288 server uses dual power supplies. The two power cables connect to two different rPDUs.
For the diagram, see the quick installation guide for the solution in use.