After the FusionModule1000 container is installed, verify the installation as illustrated in
Table 14-1
Table 14-1 Installation checklist
No.
1
2
3
4
5
6
Issue 02 (2017-01-10)
14
to ensure normal use of products and smooth subsequent installation.
Check Item
Container installation
Equipment
appearance
Water pipe
connections
Thermal insulation
layers on water pipes
External grounding
Cable connections
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

Installation Verification

Check
Expected Result
Method
Observe.
The installation conforms to the design
requirements.
Observe.
The equipment is intact and free from
inclination, distortion, pain drop, and
rust.
All connections are secure.
Observe.
Water pipes are securely connected.
Observe.
All pipes are seamlessly wrapped with
thermal insulation layers.
Observe.
Each container has at least two ground
points and is grounded securely with a
ground resistance of 10 ohms or less.
Each row of cable trays has at least two
ground points and is grounded securely
with a ground resistance of 10 ohms or
less.
All cable connections are secure,
Observe.
especially network cable connections.
Exposed parts near the wiring terminals
and lugs are wrapped with PVC
insulation tape or heat shrinking tubing.
Flat washers and spring washers of all
wiring terminals are securely installed.
Cables are routed in the way convenient
for future maintenance and expansion.