Huawei FusionModule1000A20 Installation Manual page 86

It solution
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 IT Solution
Installation Guide (2016.05, AI Version)
People inside and outside the container should work together to route the cable to the
specified connection position inside the container based on the FusionModule1000 internal
cabling plan and the connection diagram for FusionModule1000 external power cables.
To facilitate operation during internal routing, you can remove some top plate in the
container aisle.
Figure 10-12 Routing a cable into a waterproof metal connector
Step 3 Wrap four circles of waterproof tape around the joint between the cable and the waterproof
metal connector.
Figure 10-13 Wrapping sealing tape
Step 4 Tighten the waterproof metal connector using a dedicated wrench.
Figure 10-14 Securing the waterproof metal connector
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10 Cable Installation Techniques
79

Advertisement

Table of Contents
loading

Table of Contents