Site Requirements; Site Selection Requirements; Field Requirements - Huawei FusionModule1000A20 Installation Manual

It solution
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 IT Solution
Installation Guide (2016.05, AI Version)

2.1 Site Selection Requirements

2.2 Field Requirements

Issue 02 (2017-01-10)
The power supply is stable and reliable.
The communication and traffic or convenient.
The site is far away from dust, smoke, harmful gas, and corrosive, flammable, or
explosive objects.
Not on a low-lying land, and above the highest water level of that area.
The site is far away from sources of strong variation, loud noises, and strong
electromagnetic interference.
The ground is solid without spongy or soft soil, and is not prone to water aggregation or
subsidence.
The site is in an open area without obstacles 10 m around the containers.
At least 50 m away from residential areas to prevent noise pollution.
At least 500 m away from a seashore.
For a specific project, select the product specifications based on the application environment. For
example, in a class B environment 3700 m away from the seashore, the air conditioner outdoor unit can
be a common outdoor unit. In a class C environment 500–3700 m away from the seashore, the air
conditioner outdoor unit must be a class C outdoor unit.
The concrete platforms must provide an average bearing capacity greater than 50,000
2
kg/m
and be able to bear concentrated loads.
The average base strength must exceed 300 kg/cm
For the length and width requirements of concrete platforms, see the quick installation
guide for the corresponding solution.
The concrete platforms must be at least 100 mm higher than the ground, and the
levelness deviation must be less than 10 mm.
The height depends on the local drainage capability and climate.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2

Site Requirements

2
.
2 Site Requirements
2

Advertisement

Table of Contents
loading

Table of Contents